Id |
Opt |
Title |
19207 |
View
|
1209 FAULT |
6539 |
View
|
22CE 23 TUNNEL & 403 |
19295 |
View
|
ARSENIC PLANT FOR JARDINE MINING COMPANY - GENERAL DRAWING OF FURNACE |
19208 |
View
|
BEAR GULCH HANGINGWALL & FOOTWALL FAULTS |
19211 |
View
|
CLAIM & SURFACE MAP |
19209 |
View
|
CLAIM LAYOUT |
19747 |
View
|
CLAIM SURVEY MAP |
19741 |
View
|
COMPOSITE LEVEL MAP SHOWING EXTENT OF DIAMOND DRILLING EAST OF BEAR GULCH FAULT & OREBODIES DRILLED |
6531 |
View
|
COMPOSITE PLAN |
19291 |
View
|
CONTOUR MAP OF AREA BETWEEN FORTY-STAMP MILL AND ARSENIC PLANT |
19206 |
View
|
COORDINATES 1215 PORTAL - 1931 S, 418 W |
6547 |
View
|
CREVASSE & SHEEPEATER MINING DISTRICTS |
6530 |
View
|
CROSS SECTION 47,875 THRU 48,825 |
19294 |
View
|
CROSS SECTIONS B-B & C-C JARDINE MINE |
19278 |
View
|
CROSS SECTIONS OF ADITS 1020/1016/1014 (2 COPIES) |
19279 |
View
|
CROSS SECTIONS OF ADITS 1055/1023/1006 (2 COPIES) |
19280 |
View
|
CROSS SECTIONS OF ADITS 1101 |
19281 |
View
|
CROSS SECTIONS OF ADITS 1111 (2 COPIES) |
19282 |
View
|
CROSS SECTIONS OF ADITS 1222/1209 (2 COPIES) |
19283 |
View
|
CROSS SECTIONS OF ADITS 1305 (2 COPIES) |
19284 |
View
|
CROSS SECTIONS OF ADITS 803/805/808 |
19277 |
View
|
CROSS SECTIONS OF ADITS 921/904/910 |
19210 |
View
|
EAST-WEST SECTION ALONG 1800S |
6545 |
View
|
EAST-WEST VERTICAL SECTION ON COORDINATE 1700 |
6544 |
View
|
EAST-WEST VERTICAL SECTION ON COORDINATE 1800 |
6541 |
View
|
GENERAL STRUCTURAL FEATURES |
19288 |
View
|
GENERALIZED VERTICAL SECTION ALONG 1600S COORDINATE LOOKING NORTH |
19292 |
View
|
HORIZONTAL PROJECTION OF THE NO. 3 VEIN TO SHOW WORKINGS PLACES AND RESERVE ORE BLOCKS |
19917 |
View
|
JARDINE & CREVASSE DISTRICT W/GEOLOGY |
19916 |
View
|
JARDINE & CREVASSE DISTRICT W/GEOLOGY |
19918 |
View
|
JARDINE & CREVASSE DISTRICT W/GEOLOGY |
19737 |
View
|
JARDINE MINE 1000 LEVEL ELEVATION 6852 |
19738 |
View
|
JARDINE MINE 1200 LEVEL ELEVATION 6709 |
19735 |
View
|
JARDINE MINE 600 LEVEL SILL ELEVATION 7159 |
19736 |
View
|
JARDINE MINE 700 LEVEL E ELEVATION 7020 |
19285 |
View
|
JARDINE MINE SECTION 1900 S. |
19734 |
View
|
JARDINE MINE SECTION A LOOKING NORTH |
19296 |
View
|
JARDINE MINE SURFACE MAP |
19744 |
View
|
JARDINE MINE, EAST SHEET |
19745 |
View
|
JARDINE MINE, PARK COUNTY SURFACE MAP |
19743 |
View
|
JARDINE MINE, PARK COUNTY, MT |
19742 |
View
|
JARDINE MINING COMPANY-LONG SECTION NO. 9 VEIN - PLANE OF SECTION N17E |
6548 |
View
|
JARDINE MINING DISTRICT |
19212 |
View
|
LONG SECTION NO. 9 VEIN - PLANE OF SECTION N17E |
19724 |
View
|
LONGITUDINAL SECTION NO. 1 VEIN |
19286 |
View
|
LONGITUDINAL SECTION THROUGH NO. 4 VEIN, "K" RAISE WITH STOPE-FLOOR PLANS @ SOUTH END OF 1100 LEVEL |
6533 |
View
|
NO. 1 VEIN-C TUNNEL OR A2 STRAND HORIZONTAL PROJECTION |
6532 |
View
|
NO. 1 VEIN-NO. 1 STRAND HORIZONTAL PROJECTION |
6534 |
View
|
NO. 1 VEIN-NO. 2 STRAND HORIZONTAL PROJECTION |
6535 |
View
|
NO. 1 VEIN-PLAN 1202 STOPE/F.W. OR TUNGSTEN STRAND HORIZONTAL PROJECTION |
6536 |
View
|
NO. 2 VEIN - HORIZONTAL PROJECTION |
6540 |
View
|
NO. 2 VEIN - HORIZONTAL PROJECTION - 103 VEIN ON PLANE N. 40W |
6537 |
View
|
NO. 3 VEIN - PLAN AND LONG SECTION |
6538 |
View
|
NO. 4 VEIN - PLAN AND LONG SECTION |
6546 |
View
|
PLAN |
19915 |
View
|
PLAN - UNDERGROUND WORKINGS OF THE KIMBERLY-MONTANA G.M. COMPANY JARDINE (A/K/A JARDINE MINING & MILLING) |
19297 |
View
|
PLAN MAP OF MINE LEVELS & DIAMOND DRILL HOLES OF THE JARDINE MINE |
19746 |
View
|
PLAN MAP SHOWING PROPOSED 500 LEVEL (12TH FLOOR OVER 600 SILL) |
19213 |
View
|
PLAN OF MINE LEVELS & DIAMOND DRILL HOLES OF THE JARDINE MINING COMPANY |
19749 |
View
|
SAMPLE & SURFACE GEOLOGY MAP - JARDINE MINE AREA |
19716 |
View
|
SAMPLE MAP OF JARDINE GOLD MINING & MILLING COMPANY |
19205 |
View
|
SECTION A-A' |
19920 |
View
|
SECTION ALONG `1215 ADIT FROM LARGE COMPOSITE CLOTH TRACING |
19919 |
View
|
SECTION B-B' |
19921 |
View
|
SECTION B-B' - 100'=1" |
19203 |
View
|
SECTION C-C' ALONG 2300S |
19204 |
View
|
SECTION D-D' |
19728 |
View
|
SURFACE MAP JARDINE MINE, JARDINE MT |
6543 |
View
|
THROUGH NO. 14 TUNNEL |
6542 |
View
|
THROUGH NO. 15 TUNNEL |
19750 |
View
|
UNDERGROUND GEOLOGY SHEETS - JARDINE MINE |
19729 |
View
|
UNDERGROUND WORKINGS - JARDINE MINE, JARDINE MT |
19287 |
View
|
UNDERGROUND WORKINGS OF THE JARDINE MINE - OLD WORKINGS BEING ABANDONED & NEW WORKINGS UNDER DEVELOPMENT |
19289 |
View
|
UNDERGROUND WORKINGS OF THE JARDINE MINE SHOWING 700/800/900/1000/1100/1200/1300/1500 LEVELS |
31102 |
View
|
USBOM MINERAL RESOURCES (FIGURE 32) JARDINE CREVASSE MINING DISTRICT GALLATIN NATIONAL FOREST MONTANA |
19739 |
View
|
VERTICAL CROSS SECTION |
19748 |
View
|
VERTICAL CROSS SECTION - JARDINE MINING COMPANY (COORDINATES: N48150 - E51000-51640) |
19293 |
View
|
VERTICAL PROJECTION OF NO. 4 VEIN LOOKING EAST - SHADED AREAS MINED PRIOR TO NOVEMBER, 1939 |
19290 |
View
|
VERTICAL PROJECTION OF NO. 4 VEIN ON N-S PLANE |
19725 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 1400) |
19727 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 1600) |
19721 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 1700) |
19720 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 1800) |
19722 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 2200) |
19723 |
View
|
VERTICAL SECTION (E-W ON COORDINATE 2340) |
19726 |
View
|
VERTICAL SECTION THROUGH 11-12 TUNNELS |
19718 |
View
|
VERTICAL SECTION THROUGH 14 TUNNEL |
19719 |
View
|
VERTICAL SECTION THROUGH 15 TUNNEL |
19717 |
View
|
VERTICAL SECTION THROUGH 22 TUNNEL |